| Bau-How Baltic Ventspils, Latvia |
control of a 200m long hydraulic convector installation transport building modules (S7-314 and S7-Safety), 75 platforms of a weight of 6t move up to 26 modules (weight per module is up to 50t) |
| Plastal Kunststoff GmbH Rheinsdorf/Germany |
enlargement of a pallet conveyor system in the n the area in front of the high bay warehouse to further 2 alleys, TCP/IP-connection to the MFR/ S7-400 |
| DPD Depot 127 Uplengen/Germany |
Manual distribution system for parcels / S7-300 for controlling of 180 motors |
| Deutsche Waggonbau AG Görlitz/Germany |
control of a commission work station in the pre zone of a high-bay warehouse / S7-315 |
| VW Sachsen GmbH Motor manufacturing Chemnitz/Germany |
Three programmable logic controller (S7-315) for container conveyor plant at the pre zone of high-bay warehouse including label-scanning, TCP/IP-coupling to material flow control computer in the halls 300, 325 and 400 |
| BMW Fahrzeugfertigung Leipzig/Germany |
control of emergency fuel supply system at the belts 60 and 61 / S7-400 |
| Sumitomo Electric Bordnetze GmbH Zwickau/ Crossen /Germany |
control of conveyor plant as the pre zone of high-bay warehouse, TCP/IP-coupling to material flow control PC / S7-400 |
| Ulrich Rameder Anhängerkupplungen & Autoteile GmbH Munchwitz |
control of a package conveyor plant / S7-300 control of conveyor technology as first pre zone of a high-bay warehouse, TCP/IP-coupling to material flow control PC / S7-316 control of conveyor technology as second pre zone of a high-bay warehouse, TCP/IP-coupling to material flow control PC / S7-315 |
| Volkswagenwerk Wolfsburg/Germany |
Conveyor technology Delivery, mounting and commissioning of the electrical equipment for 4 push skid platform plants (Finishline) plus eight 4-column lifter and 4 transfer interfaces to Power & Free-plant as connecting conveyor technology Delivery, mounting and commissioning of the electrical equipment (Hard- and Software) for 3 cooling conveyors / S7-400 control of overhead monorail (C-Hook) / S7-400 |
| Milk-Snack Produktions GmbH Tangermünde/Germany |
control of pallet conveyor technology with pile-up function and Profibus-coupling to 2 automatic systems / S7-400 |
| VW Sachsen GmbH Mosel/Germany |
control of overhead monorail (C-hook) bodyshell manufacturing D1 / S7-400 control of overhead monorail (big C-hook) and apron conveyor / S5-135U control of chassis storage in the paint shop / AEG |
| Boizenburger Fliesenwerke GmbH Boizenburg/Germany |
control of conveyor plant as the pre zone of high-bay warehouse with material flow control PC and S7-300 |
| BMG Glauchau/Germany |
control of container conveyor technology as pre zone of a high-bay warehouse with label-scanning, TCP/IP-coupling to material flow control PC / S7-318 |
| Rudolph Spedition und Logistik Lohfelden/Kassel/Germany |
conveyor for a order-picking shelf with integrated Pick-to-Light-plant for 6800 Pick-positions with material flow control PC and 2 scanner systems with each 20 scanners |
| Deutsche Bahn AG Zwickau/Germany |
control of conveyor for case and bearing washing machine and sorting plant / S7-300 |
| EVS Chemnitz/Germany |
storage control PC of plate and container high-bay warehouse |
| German Parcel Depot 80 Munich Erding/Germany |
control of automatic distribution system for parcels to 18 destinations / SIMATIC S7 with Profibus |
| H & S Teegesellschaft St. Gangloff/Germany |
control of pallet conveyor technology as pre zone of a high-bay warehouse with material flow control PC / S5-115U |
| DPD Depot 10 Berlin/Germany |
semi-automatic distribution of packages with scanned zip codes / S5-100U |